Year of
construction |
2013 |
Class |
А |
Number of floors |
21 |
Total area |
32 sq.m |
Loss Factor |
7% |
Architect |
Architectural
center “Moscow Architects Union”. Victor Logvinov’s
architecture workshop. BPS International |
Type of the
building |
Framework made of
reinforced concrete, facade – panoramic glazing |
Spacing between
columns |
6,0 х 6,0 |
Elevators |
10 Schindler high-speed
elevators |
Heating |
Own central heating
system with a reserve gas power plant (heat recovery) |
Air conditioning
and ventilation |
Ventilation
system with heat recovery, refrigerating
equipment with a free cooling system and heat recovery into the hot water
system, a system of fan
coil units |
Electrical
equipment |
Own transformer
plant; reserve gas plant |
Automation |
Intelligent building
control “Smart home”, automated system of control and accounting of
electrical energy |
Energy saving |
Resource saving in
the lighting, heating, cold supply and ventilation systems |
Security |
24 hour security,
video surveillance and automated access control systems |
Telecommunications
|
Cisco Systems
equipment. Free choice of telecom providers. Satellite reserve channel VSAT. Overall
telephone service for all office areas, keeping and transfer of telephone
numbers. Wireless telephone
service DECT and Wi-Fi access over the whole territory and for all Country
Park premises. High-speed Internet, economic and unlimited tariffs. Hosting of
servers and telecommunication equipment of the tenants, Data Center IP-telephony and
video conferencing equipment Separation of
the technological network, tenants’ and public networks Technical
support 24х7 |