Is your office class A?


Please, check is your office class A?


Building to be classified as Class A should meet all relevant criteria apart from 1 “Must” criterion
and 4 Optional criteria. All buildings that do not meet the above parameters are classified as
Class B + buildings and below.
This classification was made by "big four":

Colliers_Logo_RGB_Rule_Gradient_s.pngCW_RGB_Large_s.jpg2011_CBRE_Logo_Green_s.jpgjll_logo.jpg


Description of criterion Class A offices

Importance_of_the criterion

Country Park

1. BUILDING SYSTEMS


BMS (Building Management System)

must

+

HVAC (Heating Ventilation and Air-Conditioning)

HVAC system that provides cooling, heating and humidity control within individual premises

must

+

HVAC capacities

Capacity to provide 24-hour cooling in server rooms. Temperature in office areas 22-23 C0, +/- 1C0. Fresh air supply 60 m3 per hour per 10 m2 of office rentable space according to planned occupancy

must

+

Modern fire security system

must

+

Elevators

Modern high quality speed elevators of major international brands

must

+

Maximum waiting time of lifts around 30 seconds

optional

+ (except_the_ rush-hour)
Power supply
Two independent sources of power supply with automatic change-over or a diesel generator power supply system emergency back-up (power supply should be minimum 70 VA of the one-time electric load per 1 m2 effective office space), UPS for emergency system

must

+

Security system

Modern security system and access control (CCTV at all entrance points and parking, electronic card access, 24-hour security personnel)

must

+

2. BUILDING STRUCTURE


Clear ceiling height 2.7-2.8 m and over

must

+
Layout
Open floor plates, efficient layout. Regular column grid not less than 6X6

must

+

Floor depth

Floor depth not more than 18-20 m from window to window. Not more than 9-10 m from window to floor plate core, 12 m – for buildings with non-regular forms and atriums

optional

+

Loss factor

Building loss factor not exceeding 12%

Loss factor= 1 (useable area/rentable area) *100%

Areas are calculated according to BOMA standards

must

≤ 7 %

Load bearing capacity not less than 400 kg/ m2 and more

must

≥ 450 kg/m2
Fit-out of common areas and facade finishing
High quality materials used in fit-out of common areas and facade finishing

must

+

Raised floors

Building is designed for full value raised floor installation

* Optional for buildings deliveredbefore 2005

must*

+

Lightning & window grid

Modern high quality windows providing ample (good) natural lighting, rational window grid

optional

+



Description of criterionClass A offices

Importance_of_the criterion

Country Park

3. LOCATION


Location
Good building location, absence of objects that can have negative impact on a building image nearby (for example functioning industrial buildings, cemeteries, dumps, prisons, etc.)

must

+

Transport access

Convenient vehicle and public transport access, i.e. 10-15-minute walk from the nearest metro station or an adequately organized shuttle-bus service

must

+

4. PARKING


Parking type

Underground parking or multilevel parking with covered way to the building. Surface guest parking Recommendation: Convenient pass for cars to parking

must

+

Parking ratio
Parking ratio for buildings:
1) within the Garden Ring not less than 1 space per 100 m2 of leasable area (1/100);
2) outside the Garden Ring, within the Third Ring Road not less than 1/80;
3) outside the Third Ring Road and within 10 km from MKAD (along-track direction to the city center) not less than 1/60;
4) 10 km from MKAD (along-track direction to the city center) and further 1/30-40 or more

optional

1/35

5. OWNERSHIP

Single ownership (the building is not sold by floors or blocks to different owners)

must

+

Transparent ownership structure

optional

+

6. PROPERTY MANAGEMENT & SERVICES


Property management

Professional property management company with not less than 5 buildings under management (not less than 5,000 m2 each) or with relevant international experience

must

BPS Russland part of BPS International GmbH (Munich)
Telecom providers
At least two independent high quality telecom providers in the building

must

+

Lobby

Efficiently organized reception area appropriate to building size, providing convenient access to the building

optional

+

Amenities

Professionally organized staff cafeteria adequate to building size and population and at least two more amenities in the building (ATM, news agency, dry-cleaning, shops, etc). Infrastructure nearby should be considered

must

+